TO PRODUCE BIOMETHANE, USE WATER_
The video is provided by YouTube and may set cookies in your browser, so it is not loaded without your permission.
2021
Injecting biomethane into distribution since
2023
Injecting biomethane into transport since
>99%
Of the time producing valid biomethane
>98%
Of available biogas converted into billable output
<2 m³
Daily water consumption
Capabilities
OUR TECHNOLOGY
Separation Principle
There is a large enough difference in water solubility between the CO2 and CH4 molecules to allow their separation by absorption under specific pressure, temperature and flow conditions. Only water is used. To reduce consumption, it is regenerated and used in a closed loop. The separation medium is water, which is free and independent of any supplier of separation media, such as membranes, adsorbents or amine solutions.
Design Constraints
Biomethane plants that process waste gas must work within a range, not at a single point, because the biogas produced varies in flow and composition. Every separation process entails losses of the target gas, but to control them a flash distillation is carried out, which recovers the CH4 absorbed in the water.
Operation and Maintenance
Absorption and desorption processes are markedly non-linear, which is why AGF's operation is essential to ensure the production of a valid gas within the design range. In turn, for the plant to run most of the time, a preventive maintenance plan and a supply of critical spare parts are also needed. The plant's main consumable is water, in quantities below 1 m³ a day. The main operating cost is electricity consumption.
Control and Communication
The stability and automation of the plant require a complex control engineering design that allows it to run autonomously. Integration reaches its optimal application when the biogas plant communicates with the biomethane plant, which adapts to process whatever gas the biogas plant is producing. The biogas plant, in turn, produces biogas depending on conditions. The result is that the biogas plant can work at a constant dome pressure.
Models
BIOMETHANE PLANTS
Biomethane
- Distribution pipeline
Compressed biomethane
- Transport pipeline
- Virtual pipeline
- Final compression for discharge at different pressures
- For virtual pipelines, AGF offers a complete filling system and the injection module to control gas discharge
Projects
OUR BIOMETHANE PROJECTS
UNUE RENOVABLES SL
Output
Average 210 Nm³/h injected
UNUE RENOVABLES SL · Image 1 of 6
PR 138 | PE 2 BM 500. Biomethane production plant using water-absorption separation, with no chemical reaction. Installed at Biogasnalia, it uses the gas generated at the biogas plant to produce biomethane. The first injection by a private company into a distribution pipeline, backed by Suma Capital and Enagás.
Features
- Commissioned: September 2021
- First injection: 25/9/2021
- Minimum injection flow: 150 Nm³/h
- Maximum injection flow: 300 Nm³/h
- Average injected flow: 210 Nm³/h
- Biomethane quality: 97.5–99.5%
- Consumption: < 0.25 kWhe/Nm³
- Injection pressure: 6 bar
- Backed by Suma Capital and Enagás